Pettit Protect High Build Epoxy Primer
Item: #2202807 | Part Number: Not Selected
Pettit Protect High Build Epoxy Primer Item # 2202807
Description
Pettit Protect High Build Epoxy Primer is a heavy duty, two component epoxy coating for use where maximum resistance to fresh or salt water is required. It reduces water absorption in fiberglass hulls, making it an excellent choice for the prevention and repair of osmotic blisters. Pettit Protect's high-solids formula allows for quicker and easier application with fewer coats necessary for effective protection. Higher-solids equals 2 coat application instead of 6 needed by competitive products. Pettit Protect also provides dependable corrosion protection on steel, aluminum, and all other underwater metals. It is ideally suited for commercial and pleasure craft applications and has excellent durability.
Features:
- Reduces water absorption in fiberglass hulls and prevents osmotic blistering
- Excellent water and chemical resistance
- Much easier application due to less coats (2 instead of 6)
- Exceptional protection for fiberglass, steel, aluminum, and other metals
Specifications:
- Vehicle Type: Epoxy/polyamide
- Finish: Low luster
- Color: Grey
- Mix Ratio (A/B): 3 to 1 (by volume)
- Curing Mechanism: Chemical cure
- Pot Life: 2 1/2 hours @ 90 °F, 5 hours @ 70 °F, 10 hours @ 50 °F
- Induction: 15 minutes @ 70 °F
- Solids by Weight: 71 +/- 2%
- Solids by Volume: 56 +/- 2%
- Coverage: 225 sq. ft./gal
- VOC:
- Part A Only: 337 g/L (2.81 lbs/gal)
- Part B Only: 347 g/L (2.89 lbs/gal)
- Parts A & B: 340 g/L (2.83 lbs/gal)
- Application Method: Brush, roller, or spray
- Number of Coats: 2 minimum, 3 recommended for best results
- Wet Film Thickness: 7.1 mils
- Dry Film Thickness: 4 mils
- Application Temp (Air and Substrate): 50 °F min / 90 °F max
- Thinner: 97 Epoxy Thinner
- Water-Based: No
- Components: 2
- Dry Time:
- 90 °F:
- To Recoat: 2 hours - 60 days
- To Bottom Paint: 3 - 6 hours
- To Launch: 12 hours minimum
- 70 °F:
- To Recoat: 3 hours - 60 days
- To Bottom Paint: 5 - 8 hours
- To Launch: 24 hours minimum
- 50 °F:
- To Recoat: 6 hours - 60 days
- To Bottom Paint: 7 - 10 hours
- To Launch: 120 hours minimum
- 90 °F: